FLEET TRUCKING FOR 15000 MT/m COAL MINE
January 4, 2011
Add Comment
TO PRODUCE A 15000 TON OF COAL
The area was conducted to Project Coal by Contractor Company, which is to support of production monthly rate at Rasio of SR=3 with 15000 MT/Month Coal.. The Team Operated by many equipment list as belowed :
1. Excavator a class of PC300 both need 2 units. Class of PC200 need 1 unit.
2. Truck for size of 20 tons, about 10 units
3. Bulldozer as size D7G , about 1 unit
4. Grader for road maintenance , 1 unit
5. Support Vehicles , about 3 unit
6. Vibro, need 1 unit....
7. Camp Office
8. Site Office
9. Personel Total = 30 persons