1 Gold Ball = average 80 gr.
Gold Ball, yes the gold ball is the word to identify that the shape as a ball content a 93% of Gold bullion. This is the part of the Alluvial gold mining result as secondary activity during exploration anyway.

That the one day working hour, about 8 hours full work and not included the rest.

As i show you on the figures is the one week worked result on the some area at the near our exploration. 

For your imagination the place is quite flat up to low hilly with a parallel drainage pattern and content a bedding lithology combine to quartz vein intercept. 

In the fact the vein is not well exposed on the surface so far, and the lithology around quartz vein is the metasediment content coarser fine grain to medium grain size and interlayer with carbonaceous shale and phyllite. 

A metamorphose process in the low level shows by the indication of platy bedding on the phyllite and comment of minerals mica. 

Back in to the Gold Ball.

Why to become a ball that alluvial gold.?

The process is long long step by step, as in alluvial gold mining, the activity has been done since view month ago and collected on the stock pile as Alluvial Stock Pile . 

While in the the dry season so that mining can be maximized as we can do, to eliminate a hauling problem , slippery haul road and any handicap.

So that while in the rainy season, there has the enough water to be processing the stock pile. 

Stepping those alluvial mining on these area as follow:

  • Mining the alluvial as optimum as we can do, during dry season. becaused of the location is on the two area season, Wet season and dry season during a year, So far by the fact that the rain is always present in the site on every day until eight month, and may be connect to the rainy season. So the mean that there are no well dray daily on the full a month.
  • In these situation collect and compile the material alluvial on the stock pile is mostly admitted.

  • Estimate the material alluvial content gold and enough for the work processing for next 6 months is most appreciate. The production alluvial processing is 8 hours work and swept about average 350 buckets of PC 125 is target in daily. 
  • To collect the alluvial , used 3 haul truck with in capacity seven tons and excavator class of pc 200. Work with average 6 hours a day enough to the operation to compile a stock pile for next process.
  • While the wet season ready come, so that the alluvial processing can start as soon as possible. The Mini Manual Palong Drum were constructed to get the cleaning the material and split the material become tailing and concentrate content gold. In generally the processing time is 8 hrs work.  

  • Than the concentrate to be process with the mini palong carpet as photo:
  • The Carpets content saturate gold while on processing concentrate. It's time to stop and cleaning the carpets. 
  • Make a one day processing in every two days  is allowed, rather than your gold losses with the run off.


  • The carpets will hits the grain material while water flowing  and the steel ram for draw boxes the water flow, so that a sedimentation occur and the gold grain trapped in the carpets.
  • This is the very conservative processing of alluvial materials as we can do on the site till now.

  • The gold grain than burn and be able to be come the Gold ball...
These latest processing step by step will continued next posting.